SAP PP T-Codes: The Complete List for S/4HANA

A T-code (transaction code) is the short command, such as CO01 or MD04, that opens a screen in SAP. In SAP PP each one runs a step of planning or production: a bill of material, an MRP run, a production order, a confirmation. This list covers about 80 working PP T-codes in 10 groups, from master data to configuration, plus the old codes that changed in S/4HANA.
Many free lists still describe SAP ECC. Every code here is checked against SAP S/4HANA, using SAP's Simplification List for S/4HANA 2025 for anything removed or replaced, and each group starts with a note on what the codes create.
PP master data T-codes: BOM, work center, routing and production version
Master data tells SAP what a product is made of, where and how. Orders copy it, so a wrong BOM or routing later becomes a wrong order.
- MM02: Change a material, including its MRP 1 to 4 and work scheduling views.
- CS01: Create a bill of material (BOM).
- CS02: Change a BOM.
- CS03: Display a BOM.
- CS11: Explode a BOM level by level.
- CS12: Explode a BOM multi-level, showing every component down to raw material.
- CS13: Summarised BOM, with the total quantity of each component.
- CS15: Where-used list: which BOMs contain a component.
- CS20: Mass change of BOMs, for example replacing one component everywhere.
- CR01: Create a work center.
- CR02: Change a work center.
- CR03: Display a work center.
- CA01: Create a routing (the operations, their work centers and standard times).
- CA02: Change a routing.
- CA03: Display a routing.
- CA85: Replace a work center in many routings at once.
- C223: Maintain production versions, which link a BOM alternative to a routing.
Production versions matter more in S/4HANA. SAP's Simplification List states that they are mandatory: MRP, planned orders and production orders only find a BOM and routing if a production version exists for them.
Demand management T-codes
Demand management records the forecast or sales plan that MRP plans against, as planned independent requirements (PIRs). The planning strategy in the material master, such as 10 for make-to-stock or 20 for make-to-order, decides how PIRs and sales orders interact.
- MD61: Create planned independent requirements.
- MD62: Change planned independent requirements.
- MD63: Display planned independent requirements.
- MC84: Create a product group, for planning or selecting a family of materials together.
Which T-codes run MRP in S/4HANA?
MRP compares requirements with stock and receipts and creates planned orders for in-house production and purchase requisitions for bought-in parts. In S/4HANA the main run is MRP Live (MD01N), which SAP calls the future technology. Classic MRP transactions are still available, and SAP has not set an end-of-life date for them (as of the 2025 Simplification List).
- MD01N: MRP Live, the HANA-optimised planning run, for a set of materials, one planner's materials or one material across all plants.
- MD01: Classic total planning online.
- MDBT: Classic total planning as a background job.
- MD02: Classic single-item, multi-level planning.
- MD03: Classic single-item, single-level planning.
- MD04: Stock/requirements list, the live view of every receipt and requirement for a material.
- MD07: Stock/requirements list for many materials at once, for example by MRP controller.
- MD05: MRP list for one material, a snapshot from the last classic run.
- MD06: MRP lists for many materials.
- MD11: Create a planned order manually.
- MD12: Change a planned order, for example to firm it.
- MD13: Display a planned order.
- MD16: Collective display of planned orders.
- MD14: Convert one planned order into a purchase requisition.
MRP Live does not write MRP lists, does not support forecast-based planning (MRP type VV) and always creates purchase requisitions (or scheduling agreement schedule lines) for externally procured materials. SAP Note 1914010 lists its current restrictions. That is why S/4HANA planners use MD04, which reads the current situation, rather than MD05.
Production order T-codes: from planned order to goods receipt
Discrete manufacturing runs on production orders. A planned order is converted into a production order, which copies the BOM and routing, is released for the shop floor and then receives its components.
- CO40: Convert one planned order into a production order.
- CO41: Convert planned orders into production orders collectively.
- CO01: Create a production order directly with a material.
- CO02: Change a production order: release it, reschedule it or set technical completion (TECO).
- CO03: Display a production order.
- CO05N: Release many production orders at once.
- CO24: Missing parts information system, which shows orders whose components are short.
- CO27: Picking list for production order components.
- MIGO: Goods issue of components to the order (movement type 261) and goods receipt of the finished product (movement type 101).
- COOIS: Production order information system, the standard report for lists of orders, operations and components.
- COHV: Mass processing of production orders, such as release, TECO or printing.
Releasing the order allows goods movements and confirmations. SAP's S/4HANA training shows orders being released either in CO02 or in the Manage Production Orders app.
Which T-codes confirm and close a production order?
Confirmations record quantities, scrap and activity times. They can backflush components and post the goods receipt automatically, depending on the control key and the material master. Closing the order is a controlling job.
- CO11N: Confirm an operation (time ticket), the most-used confirmation screen.
- CO15: Confirm the whole order at header level.
- CO13: Cancel a confirmation.
- CO14: Display a confirmation.
- COGI: Reprocess failed automatic goods movements from confirmations, such as a backflush with no stock.
- KKS2: Calculate variances for one order.
- KO88: Settle one order, which moves its remaining balance (the variance) to its receiver, usually the material.
- CO88: Settle production and process orders collectively at month-end.
Check COGI daily on a live project: failed backflushes leave stock and order costs wrong until reprocessed. Product costing itself, such as standard cost estimates, is in our SAP FICO T-codes guide.
Capacity planning T-codes
Capacity planning checks whether work centers can handle the load that MRP and production orders create, then levels it when a line is overbooked.
- CM01: Capacity load for a work center.
- CM21: Capacity levelling with the graphical planning table for a work center.
- CM25: Capacity levelling with the variable graphical planning table.
SAP's Simplification List puts CM21, CM22, CM25 and the other codes that use the graphical planning table into the compatibility scope, which has limited use rights. CM01 and other CM codes without the graphical board are not affected. SAP's replacements are Capacity Planning and Scheduling apps, such as Manage Work Center Capacity (F3289), Capacity Planning Table (F3770) and Capacity Planning Board (F3951), or Production Planning and Detailed Scheduling (PP/DS).
Repetitive manufacturing T-codes
Repetitive manufacturing suits high-volume lines that make the same product continuously. Instead of individual orders, you plan quantities per period and backflush output against a product cost collector.
- MF50: Planning table for repetitive manufacturing, where planners schedule quantities per line and period.
- MFBF: Repetitive manufacturing backflush, which posts the goods receipt and consumes components in one step.
- MF60: Pull list, for staging components to the production line.
- KKF6N: Maintain the product cost collector that collects the costs.
MF50 remains available, but its graphical planning table is compatibility scope, and SAP says no alternative graphical view is planned.
Process manufacturing (PP-PI) T-codes
Pharmaceutical, chemical and food plants use PP-PI. The objects change name: resources replace work centers, master recipes replace routings and process orders replace production orders. MRP, demand management and the BOM codes above stay the same.
- CRC1: Create a resource.
- CRC2: Change a resource.
- CRC3: Display a resource.
- C201: Create a master recipe.
- C202: Change a master recipe.
- C203: Display a master recipe.
- COR1: Create a process order.
- COR2: Change a process order, including release.
- COR3: Display a process order.
- COR6N: Confirm a process order phase (time ticket).
- CORK: Confirm a process order at header level.
- COOISPI: Process order information system.
As with production orders, a process order selects its BOM and master recipe through the production version. Our SAP QM vs SAP PP guide shows how inspection lots attach to these orders.
PP configuration T-codes
Consultants configure mostly through SPRO, but these codes reach the most-asked settings directly. They are normally locked in production.
- SPRO: Open the Implementation Guide (IMG).
- OPPQ: Carry out overall maintenance of plant parameters for MRP.
- OPPZ: Maintain MRP groups, which bundle MRP control settings for a group of materials.
- OPJH: Define production order types.
- OPL8: Order type-dependent parameters per plant, such as the default routing selection and planned cost calculation.
- OPU3: Scheduling parameters for production orders.
- OPKP: Define production scheduling profiles, which control automatic release, goods receipt and other order behaviour.
- OPK4: Confirmation parameters per plant and order type, such as whether over- and under-deliveries are checked.
Planning strategies, MRP types and lot-sizing procedures sit under SPRO, Production, Material Requirements Planning, alongside the plant parameters.
Which old PP T-codes no longer work in S/4HANA?
These are the PP codes and functions that changed, as listed in SAP's Simplification List for S/4HANA 2025. Compatibility scope means the code works but use rights are limited: for most items they ended on 31 May 2026, except in systems under a cloud subscription contract, which keep them to the end of 2030 (SAP, February 2026).
- MB31, MB1A and other MB goods movement codes: Replaced by MIGO for goods receipts and goods issues against orders.
- MD01, MD02, MD03, MDBT: Still available as classic MRP, but MD01N (MRP Live) is the future technology.
- MD05, MD06 (MRP lists): MRP lists are compatibility scope and are not written by MRP Live; use MD04 or the Manage Material Coverage app.
- Forecast-based planning (MRP type VV): Compatibility scope and not supported by MRP Live.
- Storage location MRP: Not available; plan with MRP areas instead.
- MDAB, MDRE: Not available; the planning file was redesigned, its background job uses report PPH_MDAB and report PPH_SETUP_MRPRECORDS sets it up.
- Net change in the planning horizon (processing key NETPL): Not supported; old MDBT variants that use it stop working.
- CM21, CM22, CM25 and other graphical planning table codes: Compatibility scope; replaced by Capacity Planning and Scheduling apps or PP/DS.
- MC81, MC87, MC93 and other Sales and Operations Planning codes: Compatibility scope; SAP Integrated Business Planning (IBP) is the successor. Product group codes such as MC84 remain part of the S/4HANA core.
The BOM selection method is also gone, because production versions are mandatory. For the wider picture, read SAP ECC vs S/4HANA.
Do you still need PP T-codes when Fiori apps exist?
Yes, on S/4HANA on-premise and private cloud projects. Consultants configure and troubleshoot in SAP GUI, while planners increasingly work in Fiori apps such as these:
- Manage Material Coverage (F0251): Find materials with shortages and solve them, for example by rescheduling or starting MRP.
- Schedule MRP Runs: Schedule MRP Live as a job from the Fiori launchpad.
- Manage Production Orders: Monitor, release and work through production order issues.
- Manage Work Center Capacity (F3289): See and adjust work center load and shifts.
Check app IDs for your release in the SAP Fiori Apps Reference Library.
How to find any T-code yourself
No list covers everything, so learn to look codes up in the system:
- SEARCH_SAP_MENU: Search the SAP menu by code or by a word such as "routing".
- SE93: Display a transaction's definition and the program it calls, which confirms the code exists.
- System, then Status: Shows the transaction of the screen you are on.
You can also show technical names in the Easy Access menu (Extras, Settings) and save daily codes as Favorites. In the command field, /n starts a transaction in the same session and /o in a new one.
Which PP T-codes should a fresher learn first?
Learn them in the order of one production cycle and run it end to end:
- Master data: CS01, CR01, CA01, C223
- Planning: MD61, MD01N, MD04
- Execution: CO40, CO02, MIGO, CO11N, COGI
- Reporting and close: COOIS, CO88
After each step, check MD04 to see how the planned order, production order and stock changed. Many PP exercises also touch purchasing and inventory, so keep the SAP MM T-codes guide handy; finished goods then flow to customers through the codes in our SAP SD T-codes guide.
Our SAP PP course runs for 8 to 10 weeks with SAP system access, so you practise these codes on real orders and configuration.
Frequently asked questions
How many T-codes are there in SAP PP?
SAP publishes no official count, and it changes with each release. Daily work uses a set like this one, and codes follow groups: CS for BOMs, CR for work centers, CA for routings, MD for MRP, CO for production orders and COR for process orders.
What is the difference between MD01 and MD01N?
MD01 is classic MRP, which plans a plant and can write MRP lists. MD01N is MRP Live, which plans inside the SAP HANA database and is much faster, with a flexible scope such as one MRP controller or one material across plants. MRP Live writes no MRP lists and does not support forecast-based planning. SAP treats MD01N as the future technology.
What is the difference between MD04 and MD05?
MD04, the stock/requirements list, is live: every time you open or refresh it, it reads current stock, orders and requirements. MD05 shows an MRP list, a snapshot saved by the last classic MRP run, so it can be out of date. MRP Live does not create MRP lists, so in S/4HANA planners work in MD04.
What is the difference between CO11N and CO15?
CO11N confirms individual operations, so you record yield, scrap and activity times per operation as work moves along the routing. CO15 confirms the order as a whole at header level, which suits simple orders where operation detail is not needed. Both can trigger backflushing and automatic goods receipt, depending on the settings.
What is the difference between a production order and a process order?
A production order (CO01) is used in discrete manufacturing and is built from a BOM and a routing with work centers. A process order (COR1) is used in process industries through PP-PI and is built from a BOM and a master recipe with resources and phases. Both are selected through a production version in S/4HANA.
Do PP T-codes work in SAP S/4HANA Cloud Public Edition?
Not as they do on premise. SAP S/4HANA Cloud Public Edition offers only browser-based access through the SAP Fiori launchpad, with no SAP GUI command field. You plan and produce with Fiori apps instead; the master data, MRP and order processes are the same.
Is there a PDF list of SAP PP T-codes?
This page is the list, kept to S/4HANA. Many PDFs online copy old ECC lists that still show MB31 for goods receipts. For a printable copy, save this page as a PDF from your browser and add your project's own codes.
Which PP T-codes are asked in interviews?
Mostly the everyday ones: CS01, CR01, CA01, C223, MD61, MD01N, MD04, CO01, CO02, CO11N, COGI and COOIS. Interviewers also ask about S/4HANA changes such as MRP Live, mandatory production versions and MRP areas, and scenarios such as why MRP created no planned order.